This exclusive new-build project is located in S’Alqueria Blanca, a peaceful village in the
southeast of Mallorca. The property has been designed to offer spacious and practical living areas,
combining comfort and privacy with a seamless connection between indoor and outdoor spaces.
The main floor brings together the home’s most important living areas. From the entrance hall, you enter
the open-plan kitchen, dining area and living room—a bright and spacious setting with direct access to the
terraces and garden. This floor also includes a guest toilet and an office with a full bathroom. This versatile
room can also be used as an additional bedroom, guest room or workspace.
The first floor is dedicated to the sleeping area and features three bedrooms. Two of them have their own
private bathrooms, while the master bedroom comes with an en-suite bathroom and access to a balcony
terrace. From this floor, you can enjoy lovely views of the sea and the mountains.
The ground floor benefits from plenty of natural light thanks to its large windows and offers direct access
to the garden and pool area. This level includes the fourth bedroom with a full bathroom, as well as an
exclusive wellness area featuring a gym, spa and sauna. There is also a guest toilet and an outdoor terrace
with dining and lounge areas, creating the perfect setting for enjoying both indoor and outdoor living.
The rooftop level completes the property with a spacious sun terrace featuring a jacuzzi, an outdoor
shower and a comfortable lounge area. From here, you can enjoy views of the sea, the mountains and the
church of S’Alqueria Blanca, making it the ideal place to relax or spend quality time with family and friends.
For maximum comfort all year round, the property will feature a lift connecting all floors, built-in
wardrobes in every bedroom, a laundry room and a private garage with space for one car. It will also be
equipped with ducted air conditioning, a heat pump, underfloor heating and high-quality materials and
finishes throughout.
The project is currently under construction and is expected to be completed within approximately 12 to 15
months.


















